Home Sales & Services Technical Services
Notes OF Cooling Maintenance

1)Blower of the V-belt in the initial run-time may slightly elongate, please adjust the essentials, appropriate adjustments, if too tightly closed, bearing will be damage, and caused the accident.
2)Please clean the upper part scattered water holes sink, the lower part sink filters,and so on,monthly.
3)release the belt, refuel Blower bearing and cover motor when work. In the initial run-time to determine the belt elastic, locking nut, and refuel the blower bearing, confirm whether there are bird's nest, or foreign body in tower, and then switched.
4)exchange the recycled water At least twice a year
5)Recycled water evaporated will leave dissolved in water, so that the water concentration will increases, water concentrated will increase corrosion resistance and scale, so that the cooling towers capacity will reduce, piping and equipment damage. In order to prevent this situation, proposed release part of the of recycled water.
①Open the Drain valve a bit when work (when stop running ,please turn off the drain valve)
②Cleaning the lower part of the water tank regularly
③make the water level rose when run so often spillway
④assemble automatic Change water device

Other

1)Before  operation you need to read the operation and maintenance manuals, please comply with the prohibitions, operating essentials.
2)Don’t  enter the cooling tower absolutely when Run. Don’t have to climb the upper part of tower
3)Blower run-time, never touching blower
4)Antifreeze heater will heat, please do not touch it
5)Please do not drink the water of cooling tower ,if it into the eyes rinse immediately. After the operation, please mouthwash, wash your hands
6)Tower ministries posted with warning labels, please comply with the contents of record labels.

沪ICP备06051796号