Power Elecs.
Current Position: Home > Business > Power Elecs.
Huaneng Shanghai Shidongkou First Power Plant
发布时间:2013/06/03

Huaneng Shanghai Shidongkou First Power Plant is the state key construction projects in the Seventh Five-Year Plan "period..The project start in July 1985 and install 4 units domestically produced the first batch of 30 thousands of sub-critical coal-fired units.All units put into operation in May 4,1990, is Shanghais first super-million capacity thermal power plant. The four units of the host device are Shanghai Boiler Works, Shanghai Turbine Works, Shanghai motor The four units of the host device are manufactured by Shanghai Boiler Works, Shanghai Turbine Works and Shanghai motor manufacturing planting plant. As a result of the domestic unit, the project investment is only half of the building with the capacity of imported units.
Tyacht cooling towers primarily for its air-conditioning system to be cooled.

Model:Closde Cooling Tower

  KMB-340GR×2

Legal Notice | Download Centre | Site Map | Search
Copyright: Shanghai Tyacht Cooling System Co. Ltd.

2013   沪ICP 06051796