Jining pipeline is connected to the West-East and the second Shaanxi-Beijing two gas main trunk of contact pipeline bears the important task of gas to the deployment of Hebei, Shandong, Jiangsu, gas supply, as well as the two Trunkline run entire pipe network optimization plays an important role to protect the safe and stable supply.
China National Petroleum Construction Company is responsible for PetroChina West-East Gas the Haiyuan station, the Lingtai station Tongguan station three natural gas pipeline station construction. Tingya cooling tower supporting the Haiyuan station, the Lingtai station and the Tongguan station 3 station compressor.
Medium oil pipeline material and equipment corporation is responsible for the west-east gas gao ling station, huangling, LuShan station and Peng Yang 4 station of natural gas pipeline construction